Single-lane bowling alley in the basement of a home near Atlanta. Stained concrete flooring with maple filler board along each side.
Single-lane bowling alley in the basement of a home near Atlanta. Stained concrete flooring with maple filler board along each side.
The answer to this question gets its own cute little flow chart on its own web page. See our Process page.
It can take 4 months or more to get the equipment ordered, prepped, and ready to ship.
A pair of lanes take about one week to install. Single lanes take about six days, and 4-lane projects take about 11 days.
The window of opportunity is after HVAC is up and running but before flooring is installed.